Our Projects
Nexton Medical Office Building
SCOPE: Curb work for the parking lotLOCATION: Summerville, SCGENERAL CONTRACTOR: Jennings Concrete ContractorsCOMPLETION DATE: Jan 2018PROJECT DESCRIPTION: Knight's Redi-Mix serviced Jennings...
Worldwide Equipment Office
SCOPE: Sales office building, 40k square foot building, two story.LOCATION: Jedburg, SCGENERAL CONTRACTOR: Trident ConstructionSUB-CONTRACTOR: Cooper River ContractingPump company and/or finisher:...
Hoffler Place
SCOPE: Luxury student housing apartments with below grade parking LOCATION: Charleston, SC GENERAL CONTRACTOR: Armada Hoffler SITE AND/OR SUB-CONTRACTOR: Lithko Contracting, LLC Pump company and/or...
Camp Hall Road
SCOPE: Sanitary SewerLOCATION: Berkeley CountyGENERAL CONTRACTOR: Ryan Harrison UtilitiesSTRUCTURE DESCRIPTION(S) 12’x14’ID Wet Well[dsm_image_carousel gallery_ids="54474" centered_slides="on"...
Palmetto Railway Project
SCOPE: Sanitary SewerLOCATION: North Charleston, SCGENERAL CONTRACTOR: MJLSTRUCTURE DESCRIPTION(S) 13’x18’ ID Wet Well[dsm_image_carousel gallery_ids="54472" centered_slides="on" slide_to_show="1"...
SCDOT Highway 707 Drainage Impr.
SCOPE: Water Filtration for Storm DrainageLOCATION: Horry Co, SCGENERAL CONTRACTOR: AO Hardee/ContechSTRUCTURE DESCRIPTION(S) 14’x21’ ID Water Quality Unit[dsm_image_carousel centered_slides="on"...
5th Avenue Pump Station
SCOPE: Sanitary SewerLOCATION: Myrtle Beach, SCGENERAL CONTRACTOR: MB KahnSTRUCTURE DESCRIPTION(S) 10’x20’ ID Wet Well[dsm_image_carousel gallery_ids="54463" centered_slides="on" slide_to_show="1"...
Green Jackets Ball Park
SCOPE: Sanitary SewerLOCATION: North Augusta, SCGENERAL CONTRACTOR: Barnett SouthernSTRUCTURE DESCRIPTION(S) 13’x16’ ID Storm Pump Station[dsm_image_carousel gallery_ids="54461" centered_slides="on"...
Kiawah River Plantation WWTP
SCOPE: Sanitary SewerLOCATION: Kiawah, SCGENERAL CONTRACTOR: ChandlerSTRUCTURE DESCRIPTION(S): 8’x14’ ID Wet Well[dsm_image_carousel gallery_ids="54459" centered_slides="on" slide_to_show="1"...
Wateree Elementary
SCOPE: Sanitary SewerLOCATION: Lugoff, SCGENERAL CONTRACTOR: LAD CorpSTRUCTURE DESCRIPTION(S): 3ea 2500 Gallon Precast Tanks 6’x11’ ID for Drainage Field[dsm_image_carousel gallery_ids="54457"...
Sunrise Townhomes
SCOPE: Storm DrainageLOCATION: Ladson, SCGENERAL CONTRACTOR: Three Oaks ContractorsSTRUCTURE DESCRIPTION(S): Type 16 Curb Inlets & Junction Boxes[dsm_image_carousel gallery_ids="54454"...
Langley Pond Culvert Project
SCOPE: Storm DrainageLOCATION: Aiken, SCGENERAL CONTRACTOR: Cherokee ConstructionSTRUCTURE DESCRIPTION(S): Precast Box Culvert w/Skewed Sectional End Treatments[dsm_image_carousel...
Liberty Village
SCOPE: 3 Residential home slabs. 160+ cubic yardsLOCATION: Goose Creek, SCGENERAL CONTRACTOR: Lutzen ConstructionCOMPLETION DATE: May 2018PROJECT DESCRIPTION: Knight’s Redi-Mix and Lutzen...
Eastwood Homes at Sophia Landing
SCOPE: 2 Residential home slabs, 130+ cubic yards LOCATION: Goose Creek, SC SITE AND/OR SUB-CONTRACTOR: Ringher GENERAL CONTRACTOR: Eastwood Homes COMPLETION DATE: May 2018 PUMP CONTRACTOR AND/OR...
Hampton Woods Development
SCOPE: 100 cubic yards of curbLOCATION: Jedburg, SCSITE: Hampton Woods DevelopmentSUB-CONTRACTOR: Master InnovationsCOMPLETION DATE: March 2020PROJECT DESCRIPTION: Knight’s Redi-Mix supplied Master...
J&L Wire Warehouse
SCOPE: 900 cubic yardsLOCATION: Walterboro, SCGENERAL CONTRACTOR: IP Builders, Inc.SITE AND/OR SUB-CONTRACTOR: J&L Wire Warehouse, DL AvantCOMPLETION DATE: May 2020FINISHER: Salley Concrete...
Palmetto Christian Academy
SCOPE: 2 large slab pours, 500+ cubic yardsLOCATION: Mount Pleasant, SCSITE: Palmetto Christian Academy Student life CenterGENERAL CONTRACTOR: Brantley ConstructionCOMPLETION DATE: May...
East Argent Project
SCOPE: Pump Station LOCATION: Hardeeville, SC GENERAL CONTRACTOR: JH Hiers Construction STRUCTURE DESCRIPTION(S): 12' x 20' pump station, 33 ft. deep, to service 9,500 homes in the East Argent...
Wildcat-Lindera Subdivision
SCOPE: Pump StationLOCATION: Cane Bay, SCGENERAL CONTRACTOR: JF PedersenSTRUCTURE DESCRIPTION(S): Knight's installed a pump station at Wildcat Tract, which is under development in the expanding Cane...
Family Dollar
SCOPE: 160 cubic yardsLOCATION: Bishopville, SCSITE: Family DollarSUB-CONTRACTOR: Stocks & Taylor ConstructionCOMPLETION DATE: April 2020PROJECT DESCRIPTION: Knight's Pumping and Redi-Mix poured...
Cresswind at The Ponds
SCOPE: 80+ cubic yard home slab pourLOCATION: Summerville, SCSITE: Cresswind at The PondsSUB-CONTRACTOR: Lutzen Construction CompanyCOMPLETION DATE: April 2020PROJECT DESCRIPTION: Knight's Pumping...
Clayhill Subdivision
SCOPE: Storm DrainageLOCATION: Summerville, SCGENERAL CONTRACTOR: Three Oaks ContractorsSTRUCTURE DESCRIPTION(S): Curb Inlets & Junction Boxes installed at the Clayhill Subdivision in Summers...
Sullivan’s Island Waste Water Treatment Plant
SCOPE: +200 cubic yards slab poursLOCATION: Sullivan's Island, SCSITE: Sullivan's Island Waste Water Treatment PlantSUB-CONTRACTOR: Garney ConstructionCOMPLETION DATE: June 2020PROJECT DESCRIPTION:...
Bull Street District Starbucks
SCOPE: 40 cubic yard footingLOCATION: Columbia, SCSITE: StarbucksSUB-CONTRACTOR: JRG ConcreteCOMPLETION DATE: June 2020PROJECT DESCRIPTION: Knight's Redi-Mix poured a 40 cubic yard footing for JRG...
Tri-County Global Industrial Site
SCOPE: Pump StationLOCATION: Orangeburg, SCGENERAL CONTRACTOR: Porth Contracting CompanySTRUCTURE DESCRIPTION(S): Knight's installed a pump station at the Tri-County Global Industrial Site in...
Exxon Parking Lot
SCOPE: 200 cubic yard slab pourLOCATION: Columbia, SCSITE: Exxon Parking Lot in Five PointsGENERAL CONTRACTOR: City of ColumbiaCOMPLETION DATE: June 2020PROJECT DESCRIPTION: Knight's Redi-Mix poured...
Fort Jackson
SCOPE: 20 cubic yardsLOCATION: Columbia, SCSITE: Fort JacksonSUB-CONTRACTOR: Dimig Digs LLC.COMPLETION DATE: June 2020PROJECT DESCRIPTION: Knight's Pumping provided 20 cubic yards for walkway and...
The Duke Complex
SCOPE: 241 cubic yards of curbLOCATION: Ladson, SCSITE: The DukeSUB-CONTRACTOR: L. Dean Weaver ConstructionCOMPLETION DATE: May 2020PROJECT DESCRIPTION: Knight's Redi-Mix provided 241 cubic yards of...
Enmarket
SCOPE: Headwall and Box CulvertLOCATION: Pooler, GASITE: Enmarket on Pine Barren RoadSUB-CONTRACTOR: Eastern ExcavatingCOMPLETION DATE: July 2020STRUCTURE DESCRIPTION: Our precast crews in Richmond...
Santa Cruz Nutritionals
SCOPE: Settling BoxLOCATION: Sumter, SCSITE: Santa Cruz NutritionalsSUB-CONTRACTOR: Randy Pigate ConstructionCOMPLETION DATE: August 2020STRUCTURE DESCRIPTION: Precast manufactured this 6'x24'...
Food Lion
SCOPE: 717 cubic yards, including footings and slab poursLOCATION: Jedburg, SCSITE: Food LionSUB-CONTRACTOR: 360 Concrete and Construction, Salley Concrete Finishing and Jennings Concrete...
Bradford Pointe
SCOPE: 40 cubic yards LOCATION: Summerville, SC SITE: Bradford Pointe SUB-CONTRACTOR: Baytree Landscapes COMPLETION DATE: August 2020 PROJECT DESCRIPTION: Knight's Redi-Mix and Pumping teamed up to...
Camp Cole
SCOPE: 2 residential slabs, approximately 120 yardsLOCATION: Columbia, SCSITE: Camp ColeSUB-CONTRACTOR: Great Southern HomesCONCRETE FINISHERS: Palmetto Concrete FinishingCOMPLETION DATE: November...
Dollar General
SCOPE: 183 cubic yardsLOCATION: Manning, SCSITE: Dollar GeneralGENERAL CONTRACTOR: DooleyMackCOMPLETION DATE: September 2020PROJECT DESCRIPTION:Knight's Redi-Mix poured 183 cubic yards with some...
Blackstone Subdivision
SCOPE: 120 cubic yards of curbLOCATION: Moncks Corner, SCSITE: Blackstone SubdivisionSUB-CONTRACTOR: Jennings Concrete ContractorsCOMPLETION DATE: September 2020PROJECT DESCRIPTION:Knight's Redi-Mix...
Gibson Pond Dam
SCOPE: 408 CYLOCATION: Lexington, SCSITE: Gibson Pond DamGENERAL CONTRACTOR: Crowder ConstructionCOMPLETION DATE: November 2020PROJECT DESCRIPTION:Knight's Redi-Mix supplied 408 cubic yards of...
Sax Gotha Industrial Park | Speculative Building
SCOPE: 104,000 sq. ft.LOCATION: Lexington, SCSITE: Saxe Gotha Industrial ParkSUB-CONTRACTOR: Palmetto Concrete Group LLC.GENERAL CONTRACTOR: M.B. Khan ConstructionCOMPLETION DATE: November...
Carnes Crossroads
SCOPE: 114 CYLOCATION: Summerville, SCSITE: Carnes Crossroads Phase 10SUB-CONTRACTOR: Jennings Concrete ContractorsCOMPLETION DATE: December 2020PROJECT DESCRIPTION:Knight's Redi-Mix supplied 114 CY...
Hugh K. Leatherman Terminal
SCOPE: 48,000 CYLOCATION: Charleston, SCSITE: Hugh K. Leatherman TerminalSUB-CONTRACTOR: Archer Western and Loveless Commercial ContractingGENERAL CONTRACTOR: Banks ConstructionCOMPLETION DATE:...
Mt. Holly Commerce Park
SCOPE: Pump StationLOCATION: Moncks Corner, SCSITE: Mt. Holly Commerce ParkGENERAL CONTRACTOR: MJL, Inc.COMPLETION DATE: February 2021PROJECT DESCRIPTION:Originally designed to be cast-in-place,...
Mark Anthony Brewing Production Facility | Project Sunshine
SCOPE: 48,000 CY covering 700,000 sq. ft.LOCATION: Columbia, SCSITE: Project SunshineSUB-CONTRACTOR: Concrete Strategies LLC. and Swagert ConstructionGENERAL CONTRACTOR: ClaycoCOMPLETION DATE: March...
Garden City Terminal
SCOPE: 19,000 CYLOCATION: Savannah, GeorgiaSITE: Garden City Terminal at the Port of SavannahSUB-CONTRACTOR: TIC - The Industrial CompanyCOMPLETION DATE: June 2024PROJECT DESCRIPTION: Knight's...
University of South Carolina’s Campus Village
SCOPE: 6,789 CYLOCATION: Columbia, SCSITE: University of South Carolina's Campus VillageSUB-CONTRACTOR: Donley's Inc.GENERAL CONTRACTOR: Juneau ConstructionCOMPLETION DATE: January 2022PROJECT...
TradePark East
SCOPE: 840,000 sq. ft.LOCATION: North Charleston, SCSITE: TradePark EastSUB-CONTRACTOR: Buchanan ConcreteGENERAL CONTRACTOR: Frampton ConstructionCOMPLETION DATE: May 2022PROJECT DESCRIPTION: ...
Jumping Run Road Bridge
SCOPE: 10 feet wide by 15. 5 foot long bridge decksLOCATION: Andrews, SCSITE: Jumping Run Road BridgeGENERAL CONTRACTOR: The Bastion GroupCOMPLETION DATE: October 2021PROJECT DESCRIPTION: Whether...
Lineage Logistics
SCOPE: 48,000 CY covering 700,000 sq. ft.LOCATION: North Charleston, SCSITE: Lineage LogisticsGENERAL CONTRACTOR: Allston Farrell ConstructionCOMPLETION DATE: June 2021PROJECT DESCRIPTION: Knight's...
E.L Wright Middle School
SCOPE: 170,000 sq. ft.LOCATION: Columbia, SCSITE: E.L Wright Middle SchoolGENERAL CONTRACTOR: Contract Construction, Inc.COMPLETION DATE: June 2022PROJECT DESCRIPTION: Knight's Redi-Mix supplied...
West Edisto Sewer System
SCOPE: Manholes and sewer systemLOCATION: Orangeburg CountySITE: Orangeburg County - West Edisto Sewer SystemGENERAL CONTRACTOR: GH Smith ConstructionCOMPLETION DATE: July 2021PROJECT DESCRIPTION: ...
Dorchester County Emergency Operations Center
SCOPE: 15,000 sq. ft.LOCATION: Summerville, SCSITE: Dorchester County Emergency Operations CenterSUB-CONTRACTOR: 360 Concrete and ConstructionGENERAL CONTRACTOR: Brantley Construction...
Battery Park Pedestrian Bridge
SCOPE: 100 CY for prestressed concrete pile and bridge deck slabsLOCATION: North Charleston, SCSITE: Battery Park Pedestrian BridgeSUB-CONTRACTOR: Tekna CorporationGENERAL CONTRACTOR: Thomas and...
Medline Industries, Inc.
SCOPE: 4,000 CY for concrete curbLOCATION: Richmond Hill, GASITE: Medline Industries, Inc.SUB-CONTRACTOR: Phillips Paving Co.COMPLETION DATE: April 2021PROJECT DESCRIPTION: Knight's Redi-Mix...
Thomas Island Regional Pump Station
SCOPE: Pump Station LOCATION: Charleston, SC SITE: Thomas Island Regional Pump Station GENERAL CONTRACTOR: MJL, Inc. COMPLETION DATE: April 2021 PROJECT DESCRIPTION: Knight's Precast manufactured...
Tractor Supply Co.
SCOPE: 800 CYLOCATION: Savannah, GASITE: Tractor Supply Co.SUB-CONTRACTOR: Bowman's Works, Inc.COMPLETION DATE: March 2021PROJECT DESCRIPTION: Pouring footers, interior slabs and exterior slabs...
Interstate West
SCOPE: 46,000 CYLOCATION: Ellabell, GASITE: Interstate WestSUB-CONTRACTOR: Full Tilt Contracting, LLC.DEVELOPER: VanTrust Real EstateCOMPLETION DATE: March 2022PROJECT DESCRIPTION:Requiring 46,000...
SunPort 95 | FedEx
SCOPE: 100,000 CYLOCATION: Pooler, GASITE: SunPort 95SUB-CONTRACTOR: Martin Concrete ConstructionCOMPLETION DATE: June 2022PROJECT DESCRIPTION:Supplying concrete for two commercial buildings at this...