SCOPE: Settling Box
LOCATION: Sumter, SC
SITE: Santa Cruz Nutritionals
SUB-CONTRACTOR: Randy Pigate Construction
COMPLETION DATE: August 2020
STRUCTURE DESCRIPTION:
Precast manufactured this 6’x24′ settling box with two baffle walls to help with filtration. It weighs 47 tons. Since Santa Cruz bought a pre-existing facility, they retained all previous employees and added new jobs to the area, but this box was a part of the facility’s expansion.