by Site Admin | Apr 22, 2021 | News, RediMix
COLUMBIA, South Carolina ─ By refurbishing its Irmo Plant and erecting a new dry batch plant in Lexington, South Carolina, Knight’s Redi-Mix is preparing for more growth in the Midlands Market. In 2017, Knight’s Redi-Mix received the Irmo Plant through the acquisition...
by Site Admin | Feb 24, 2021 | News, RediMix
SAVANNAH, Georgia – Knight’s Redi-Mix is expanding into the Savannah Market with a new Georgia division, KRM South. With two new dry batch plants, 13 mixer drivers and a core group of customers built through connections in the Midlands and Lowcountry, KRM South is...
by Site Admin | Nov 13, 2020 | Employees, RediMix, Trucking
While Veterans Day is set aside on the calendar as the day to recognize soldiers for their service, Americans have a lot to thank veterans for every day. Throughout our nation’s history, they’ve kept their oath to defend the Constitution, every American and ensure our...
by Site Admin | Jul 30, 2020 | concrete, Concrete Pumping, PreCast, RediMix, Trucking
As much as we love summer at Knight’s Companies, we must admit there are some drawbacks to the season. Along with more business activity comes oppressive heat and humidity, which puts workers at risk for heat-related illnesses. The human body can only handle so much,...
by Site Admin | Jul 17, 2020 | concrete, Concrete Pumping, RediMix
When the clouds come rolling in, it’s never a good day for a ready-mix concrete supplier or construction crew. Inclement weather often results in changes to the dispatch schedule or outright cancelled orders, and sometimes just the threat of rain can postpone projects...
by Site Admin | Jun 4, 2020 | concrete, Concrete Pumping, RediMix
As summer begins, daily temperatures are on the rise, which can cause difficulties when placing and finishing concrete at job sites. Temperatures above 80 degrees mean a faster setting time, the potential for more crazing and plastic shrinkage cracking, slump loss,...